![]() ![]() and the date QP received SIP/DIP as date of SIP/DIP. For DC Submission to PUB, QP shall use the purchase order No.Upon receipt of infrastructure plans, QP shall conduct site surveys to verify the alignments and invert levels of the public sewers/pumping mains/sewer connections and drainage reserves/common drains/water mains.Plan Type (service plan for drainage/sewerage/water).Lot Information of project site (Mukim No.QP shall provide the following information when requesting for service plans.The position and alignment of the watermains shall be indicated on the survey plan, and shown at site to allow easy identification of the watermains in future after completion. QP is to determine and indicate the exact alignments and depths of the watermains, submains and connections, on site by means of trial holes before commencement of any work. Smaller submains and connection pipes (< 100 mm) to customers' premises/properties may not be included. Water Service Plan (WSP) indicates the approximate position of the water mains and raw water mains in the vicinity of the development.QP should ascertain/verify details of the common drains on site and the Minimum Platform Level (MPL) for effectual surface water drainage. The DIP may not show details of the common drain at the development. ![]() ![]() Drainage Interpretation Plan (DIP) indicates drainage reserves or land reserved for future drainage schemes.QP should ascertain/verify details of the existing sewer connection on site Details of the existing sewer connections at the development may not be shown on the SIP. Sewerage Information Plan (SIP) indicates the location and alignment of public sewers or pumping mains in the vicinity of the development.Before proceeding with the design of a proposed development, QP must apply to PUB for the relevant sewerage, drainage and water information:. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |